Finally, from 1990 to 1997 the remaining 21 non-university buildings to the east of Sabine were replaced with pavement. As a result of the slope of the area toward Waller Creek and the near zero permeability, elevated levels of runoff enter the watershed due to this transformation from vegetative ground cover to parking lots. |